Operations management productivity problems analysis

Operations Management and Factors Affecting Productivity (100 points)Maduro Cleaning is a small organization that provides cleaning services to both residential and commercial clients. As a small organization, the owner assigns crews of two, three, or four employees to jobs each morning but the owner does not have a good method of determining a reasonable amount of time that each cleaning should take. The owner decided to keep data on job times and crew sizes in the hopes of developing a productivity measure. Address the following requirements:

Calculate which of the crew sizes has the best productivity per worker and explain your method.
Evaluate your outcome and the possible reasons that would explain those results.
Project what the productivity might be for a crew size of five and explain your reasoning.
Crew Size Avg: Productivity per Crew

2: 3765 square meters per day
3: 4915 square meters per day
4: 6309 square meters per day
Directions:

Your assignment is required to be four to five pages in length, which does not include the title page and reference pages, which are never a part of the content minimum requirements.
Support your submission with course material concepts, principles, and theories from the textbook and at least three scholarly, peer-reviewed journal articles.
Formatted according to APA 7th edition writing standards.
Review the grading rubric to see how you will be graded for this assignment.

Required:

Review Chapters 1 & 2 in Operations Management

Review Chapter 1 PowerPoint slides Click for more optionsModule 2 Chapter 1 PowerPoint slides – Alternative Formats —Operations Management

Review Chapter 2 PowerPoint slides Click for more optionsModule 2 Chapter 2 PowerPoint slides – Alternative Formats —Operations Management

Zhou, K., Bochtis, D., Jensen, A. L., Kateris, D., & Sørensen, C. G. (2020). Introduction of a new index of field operations efficiency. Applied Sciences, 10(1), 329.

Pilo, M. (2019). Dynamics of Agricultural Productivity and Technical Efficiency in Togo: The Role of Technological Change. African Development Review, 31(4), 462–475. https://doi.org/10.1111/1467-8268.12403

Zondo, R. (2020). The influence of inventory sequencing for the improvement of inventory control: Evidence from a South African automotive assembly organization. Acta Commercii, 20(1).

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our Guarantees

Money-back Guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism Guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision Policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy Policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation Guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more
error: